Operation of Ultra Sonic Bath |
1.0 PURPOSE 1.1 To Define procedure for operation of ultra sonic bath in quality control department. 2.0 SCOPE 2.1 This procedure for operation of ultra sonic bath in quality control department. 3.0 REFERENCE(S) & ATTACHMENTS 3.1 In house 3.2 Attachments 3.3 NA 4.0 RESPONSIBILITY 4.1 Quality control Officer/ Executive: 4.1.1 To initiate the preparation of Standard operating procedure through the inputs from the employees directly concerned with the activity. 4.1.2 To prepare the SOP and list of all assigned numbers of the SOP for their departments. 4.2 Quality Control Head: 4.2.1 To confirm the content, accuracy and detailing about of SOP. 4.2.2 To organize the approval of SOP from Quality assurance (QA head) and Location Head. 4.2.3 To ensure the training of the SOP to all concerned involved in implementation of the SOP. 4.2.4 To ensure user the implementation of the SOP after training. 4.3 Quality Assurance Department 4.3.1 To check the SOP and maintain the original copy of the SOP. 4.3.2 To issue controlled copy of the SOP and maintain issuance record of SOP. 4.3.3 To retrieve the controlled copy of the SOP when it is superseded/obsolete. 4.3.4 To control and monitor the review process of the SOP. 4.4 Quality Assurance Head & Location Head 4.4.1 To review and approve SOP. 4.4.2 To ensure the implementation of the defined system at quality control. 5.0 DISTRIBUTION 5.1 Quality control department 6.0 ABBREVIATION(S) 6.1 SOP : Standard Operating Procedure 6.2 QA : Quality Assurance 6.3 QC : Quality Control 6.4 No. : Number 6.5 VAC : Voltage Alternate current 6.6 NA : Not Applicable |